AI Technologist. Pre-Project Survey

Artificial intelligence

AI Technologist. Pre-Project Survey

All options and prices

Pre-project survey 'AI Technologist': analysis of current processes, formation of technical specifications, target architecture, cost estimation, and timelines for industrial implementation.

Description

The pre-project survey is a mandatory step before the industrial implementation of the 'AI Technologist' system. Based on the survey results, a technical specification, target architecture of the solution, and an accurate cost estimate for implementation are formed.

The survey is conducted by a team of analysts and engineers in collaboration with key specialists from the client: technologists, IT service, and production managers.

Duration: from 2 to 4 weeks (depends on the scale of the enterprise and the number of production sites)

What is included

1. Audit of current business processes

  • Study of the existing technological preparation process
  • Identification of decision-making points and areas of responsibility
  • Analysis of the current workload on technologists and standardizers
  • Assessment of the volume and nomenclature of processed drawings
  • Identification of bottlenecks and time losses

2. Work with key specialists

  • Interviews with technologists and standardizers
  • Interviews with IT specialists and system administrators
  • Interviews with heads of production departments
  • Collection of requirements and expectations from the system

3. Data and systems analysis

  • Determination of design documentation formats (drawings, specifications)
  • Inventory of used systems (1C, PDM/PLM, CAD, etc.)
  • Preliminary analysis of accounting and related systems
  • Assessment of the quality and completeness of regulatory and reference information
  • Analysis of historical data on routes and standardization

4. IT infrastructure analysis

  • Assessment of server capacities for system deployment
  • Analysis of network infrastructure
  • Assessment of readiness for integration with 1C (when choosing Professional/Enterprise versions)
  • Determination of hardware requirements

5. Formation of target architecture

  • Design of the target interaction scheme of AI Technologist with existing systems
  • Definition of the composition of modules and system configuration
  • Recommendation on the choice of product version (Basic, Standard, Professional, Enterprise)
  • Definition of implementation stages

6. Preparation and approval of technical specifications

  • Formation of functional requirements
  • Description of system usage scenarios
  • Definition of acceptance criteria
  • Approval of technical specifications with the client

7. Cost estimation for implementation

  • Formation of a detailed work plan for implementation
  • Assessment of labor intensity and timelines for each stage
  • Calculation of the total cost of industrial implementation
  • Formation of a commercial proposal

Survey Results

As a result of the pre-project survey, the client receives:

  • Survey Results Report — description of the current state of processes, identified problems, and recommendations
  • Target Architecture of the Solution — interaction scheme of AI Technologist with the enterprise systems
  • Technical Specification for Implementation — approved document with functional requirements and acceptance criteria
  • Recommendation on Product Version — justification for the choice of the optimal version
  • Implementation Schedule — stages, timelines, responsible parties
  • Commercial Proposal for Implementation — detailed cost estimate for industrial implementation

Procedure

StageDuration
Project launch, data collection1–2 days
Interviews with specialists3–5 days
Data, systems, and infrastructure analysis3–5 days
Formation of target architecture2–3 days
Preparation of technical specifications and cost estimates3–5 days
Approval of results with the client2–3 days